From belt drive to BITZER: upgrading a 10-year-old ElectraTherm ORC
We’ve had a busy few days upgrading a 10-year-old ElectraTherm ORC (organic Rankine cycle) unit, replacing its original drive train with the BITZER semi-hermetic expander generator.
Before: separate expander, shaft seal and belt drive
The original design used a separate expander with a shaft seal, belt-driven to an external generator. The shaft seal is the weak point: it is where working fluid can leak out of the system, and the belt needs regular tensioning and replacement.

After: BITZER semi-hermetic expander generator
We replaced it with the BITZER semi-hermetic expander generator, which has been standard on new ElectraTherm units for the past five years. The generator now sits inside the sealed unit, surrounded by the working fluid, so there is no shaft seal at all.

Why it matters
Significantly fewer leaks and much less working fluid lost
No belts to tension or replace
A simpler, cleaner design that is easier to maintain
Running an older ElectraTherm unit?
If you operate an older ElectraTherm ORC and would like to talk about upgrading it, get in touch at sales@koolbricks.co.uk.




Comments